|
|
SH 45 SEClient: Texas Department of Transportation Location: Austin, TX Start Date: July 2007 End Date: May 2009 Contract Amount: $139.6 million
The SH 45 SE project called for construction of a four-lane electronic
toll road southeast of Austin, Texas. The 7.5-mile road connects the SH
130 toll road with IH-35, south of the Austin city limits.
A
joint venture with T.J. Lambrecht, the project included the
construction of 23 bridge structures, one of them an interchange with
US 183/SH 130, and a direct-connect interchange with IH-35. The work,
which began in July 2007, also included reconstruction of about 2.5
miles of IH-35 main lanes and frontage roads to accommodate the new
interchange.
|